RE-GAUGE, Tamping Machine 08-32 U
Last updated: 20 Nov 2025
299 Views

Completed re-gauging of Tamping Machine 08-32 U for Tipakorn Company Limited, adapting the equipment to specific operational requirements while maintaining performance standards and ensuring compatibility with their railway infrastructure.
Related Content
Re-gauged Tamping Machine 08-2XS for Krungthon - Thai Products, ensuring performance and reliability.
Installed painting control boards for the Red Line Project, enhancing efficiency and quality.
Completed re-gauging and commissioning of DD-51 locomotive from Japan for A.S. Associate Engineering (1964).


