Share

Installation of Laser Equipment on Tamping Machine 08-2X-32S

Last updated: 13 Jun 2026
629 Views
A.F.S. Enterprise installed advanced laser alignment equipment to Tamping Machine 08-2X-32S for UNIQUE Engineering & Construction. This precision enhancement improves track alignment accuracy, reduces the need for manual measurement, and increases the overall efficiency of track maintenance operations — contributing to higher quality railway infrastructure.

Related Content
Installation, Modification, Commissioning and Testing of Crane Wagon with Engine — Chiang Rai Railway Project
A.F.S. Enterprise successfully completed the installation, modification, commissioning, comprehensive testing, and on-site deployment of a self-propelled Crane Wagon with Engine, ensuring the equipment was fully operational and ready for railway maintenance service before final handover to the customer.
Repair & Modification of 350HP Locomotive from Japan
A.F.S. Enterprise completed repair and modification of a 350HP locomotive from Japan for SSCH Joint Venture, enhancing its operational capabilities and extending its service life.
Re-gauge & Commissioning of DD-51 Locomotive from Japan
Re-gauged aA.F.S. Enterprise re-gauged and commissioned a DD-51 locomotive from Japan for Laos Railway, ensuring reliable performance across the Laos railway network.nd commissioned DD-51 locomotive from Japan for Laos Railway.
เว็บไซต์นี้มีการใช้งานคุกกี้ เพื่อเพิ่มประสิทธิภาพและประสบการณ์ที่ดีในการใช้งานเว็บไซต์ของท่าน ท่านสามารถอ่านรายละเอียดเพิ่มเติมได้ที่ Privacy Policy and Cookies Policy
Powered By MakeWebEasy Logo MakeWebEasy