Share

Flat Wagon with Dual Brake System Rental — Den Chai–Chiang Rai Double-Track Railway Project (CKST DC2 & DC3 Joint Venture)

Last updated: 29 Jun 2026
166 Views
A.F.S. Enterprise provided flat wagons fitted with a dual brake system — combining both Vacuum Brake and Air Brake systems — for rental to CKST DC2 and DC3 Joint Venture, for deployment in the Den Chai–Chiang Rai Double-Track Railway Construction Project. The flat wagons were utilized to transport heavy equipment and machinery along the construction corridor, including the Holland Rail Services Australia INTELLIWELD Mobile Welder unit (M.W. 981), supporting rail welding operations on site. The dual brake system configuration ensures full compatibility and safe operation within the existing railway network during construction phase activities. This project reflects A.F.S. Enterprise's capability in providing reliable railway wagon rental solutions with the right technical specifications to meet the demands of large-scale infrastructure projects.

Related Content
Re-gauge of Railway Equipment for UNIQUE Engineering & Construction
A.F.S. Enterprise performed re-gauging services for UNIQUE Engineering & Construction, adapting railway equipment for different track gauges and ensuring operational flexibility.
Supply of Long Welded Rail (LWR) Trolleys — Malaysia & Myanmar
A.F.S. Enterprise successfully supplied Long Welded Rail (LWR) trolleys to clients in Malaysia and Myanmar, strengthening their railway infrastructure capabilities.
Re-gauge of Tamping Machine 08-2XS
A.F.S. Enterprise re-gauged Tamping Machine 08-2XS for Krungthon - Thai Products, ensuring performance and reliability.
เว็บไซต์นี้มีการใช้งานคุกกี้ เพื่อเพิ่มประสิทธิภาพและประสบการณ์ที่ดีในการใช้งานเว็บไซต์ของท่าน ท่านสามารถอ่านรายละเอียดเพิ่มเติมได้ที่ Privacy Policy and Cookies Policy
Powered By MakeWebEasy Logo MakeWebEasy