Share

Re-gauge & Overhaul of F215 HP Locomotive from Japan

Last updated: 13 Jun 2026
468 Views
A.F.S. Enterprise completed comprehensive re-gauging and overhaul of an F215 HP locomotive from Japan for V.Visarut Construction. Our services included gauge conversion to match local track standards, full mechanical overhaul, electrical system inspection, replacement of key components, and performance testing — ensuring the locomotive was fully ready for optimal operation in its new operational environment.

Related Content
Installation, Modification, Commissioning and Testing of Crane Wagon with Engine — Chiang Rai Railway Project
A.F.S. Enterprise successfully completed the installation, modification, commissioning, comprehensive testing, and on-site deployment of a self-propelled Crane Wagon with Engine, ensuring the equipment was fully operational and ready for railway maintenance service before final handover to the customer.
Re-gauge of Tamping Machine 08-32 U
A.F.S. Enterprise re-gauged Tamping Machine 08-32 U for Tipakorn Company Limited, ensuring performance and compatibility with their railway infrastructure.
Service and Commissioning of Standard Gauge Motor Car with Crane — MRT Orange Line
A.F.S. Enterprise completed full service and commissioning of a standard-gauge motor car with crane for the MRT Orange Line Project.
เว็บไซต์นี้มีการใช้งานคุกกี้ เพื่อเพิ่มประสิทธิภาพและประสบการณ์ที่ดีในการใช้งานเว็บไซต์ของท่าน ท่านสามารถอ่านรายละเอียดเพิ่มเติมได้ที่ Privacy Policy and Cookies Policy
Powered By MakeWebEasy Logo MakeWebEasy