Modification, Refurbishment & Testing of DD51 Diesel Locomotive from Japan — A.F.S. Enterprise
A.F.S. Enterprise successfully completed the modification, refurbishment, and comprehensive testing of a DD51 diesel locomotive imported from Japan, preparing the locomotive for reliable operation in accordance with customer requirements.
Installation, Modification, Commissioning and Testing of Crane Wagon with Engine — Chiang Rai Railway Project
A.F.S. Enterprise successfully completed the installation, modification, commissioning, comprehensive testing, and on-site deployment of a self-propelled Crane Wagon with Engine, ensuring the equipment was fully operational and ready for railway maintenance service before final handover to the customer.
Installation of Air Brake System on Ballast Hopper Wagons — CKST DC2 & DC3 Joint Venture
A.F.S. Enterprise designed, engineered, and installed complete air brake systems on 12 Ballast Hopper Wagons for CKST DC2 & DC3 Joint Venture, upgrading each wagon with a dual brake configuration to enhance operational safety and railway compatibility for the Den Chai–Chiang Rai Double-Track Railway Construction Project.
Servicing of 12 Ballast Hopper Wagons — CKST DC2 and DC3 Joint Venture
A.F.S. Enterprise completed the full servicing of 12 Ballast Hopper Wagons for CKST DC2 and DC3 Joint Venture, restoring all units to operational readiness for active deployment on the railway construction project.
Refurbishment, Overhaul and Modification of Plymouth 750HP Diesel Locomotive — Gauge Convertible (Meter to Standard Gauge)
A.F.S. Enterprise completed the full refurbishment, mechanical overhaul, and modification of a Plymouth 750HP diesel locomotive, restoring the locomotive to operational condition while preparing it for gauge conversion from Meter Gauge (1,000 mm) to Standard Gauge (1,435 mm).
Fabrication and Installation of Crane Platform for Crawler Crane — Metroline Electrical Network Co., Ltd.
A.F.S. Enterprise completed the fabrication and installation of a safety work platform for a crawler crane, delivered to Metroline Electrical Network Co., Ltd. for use in electrical network construction operations.
Service and Commissioning of Standard Gauge Motor Car with Crane — MRT Orange Line
A.F.S. Enterprise completed full service and commissioning of a standard-gauge motor car with crane for the MRT Orange Line Project.
Service and Commissioning of DMU — Democratic Republic of Congo
A.F.S. Enterprise performed service and commissioning of 7 units of DMU in the Democratic Republic of Congo, Africa.
Maintenance Contracts & Technical Support
A.F.S. Enterprise provides comprehensive long-term maintenance agreements with railway operators and industrial clients, ensuring maximum uptime and operational safety.
Repair of Krupp Locomotive After an Accident — Royal Railway Cambodia
A.F.S. Enterprise successfully repaired a Krupp locomotive for Royal Railway, Cambodia following an accident, restoring it to full operational condition.
Re-gauge & Overhaul of F215 HP Locomotive from Japan
A.F.S. Enterprise completed comprehensive re-gauging and overhaul of an F215 HP locomotive from Japan for V.Visarut Construction, ensuring optimal operation in its new environment.
New Painting Control Board — Red Line Project
A.F.S. Enterprise designed and installed new painting control board systems for the Red Line Project, enhancing operational efficiency and paint quality in railway maintenance facilities.
Repair & Modification of 350HP Locomotive from Japan
A.F.S. Enterprise completed repair and modification of a 350HP locomotive from Japan for SSCH Joint Venture, enhancing its operational capabilities and extending its service life.
Repair & Modification of DD-439 500HP Locomotive from Japan
A.F.S. Enterprise performed comprehensive repair and modification of a DD-439 500HP locomotive from Japan for SSCH Joint Venture, ensuring reliable operation and extended service life.
Repair & Modification of TMC 400A Locomotive from Japan
A.F.S. Enterprise completed the repair and modification of a TMC 400A locomotive from Japan for Sumitomo Corporation, ensuring optimal performance and operational reliability.
Lifting & Re-railing of De-railed Locomotive — Red Line Project
A.F.S. Enterprise performed emergency lifting and re-railing of a de-railed locomotive for Pestech Technology on the Red Line Project, ensuring a safe and efficient recovery.
Testing of TMC 400 Equipment for V.Visarut Construction
A.F.S. Enterprise conducted comprehensive testing of TMC 400 equipment for V.Visarut Construction to verify its performance, safety, and operational reliability.