Servicing of 12 Ballast Hopper Wagons — CKST DC2 and DC3 Joint Venture
Last updated: 29 Jun 2026
142 Views

A.F.S. Enterprise carried out the complete servicing of 12 Ballast Hopper Wagons for CKST DC2 and DC3 Joint Venture, in support of the Den Chai–Chiang Rai Double-Track Railway Construction Project. The wagons, which arrived in heavily weathered and worn condition, underwent thorough servicing covering mechanical system inspection and repair, hopper discharge gate mechanism overhaul, valve and control wheel servicing, undercarriage and bogie inspection, brake system checking, structural cleaning, and full surface preparation and repainting. Upon completion, all 12 units were lined up and confirmed ready for operational deployment, ensuring reliable ballast distribution performance throughout the construction corridor. This project demonstrates A.F.S. Enterprise's capability to efficiently service and restore large fleets of railway wagons to full operational standard within project timelines.
Related Content
A.F.S. Enterprise successfully completed the installation, modification, commissioning, comprehensive testing, and on-site deployment of a self-propelled Crane Wagon with Engine, ensuring the equipment was fully operational and ready for railway maintenance service before final handover to the customer.
A.F.S. Enterprise designed and installed new painting control board systems for the Red Line Project, enhancing operational efficiency and paint quality in railway maintenance facilities.
A.F.S. Enterprise performed re-gauging services for UNIQUE Engineering & Construction, adapting railway equipment for different track gauges and ensuring operational flexibility.


