Share

Servicing of 12 Ballast Hopper Wagons — CKST DC2 and DC3 Joint Venture

Last updated: 29 Jun 2026
4 Views
A.F.S. Enterprise carried out the complete servicing of 12 Ballast Hopper Wagons for CKST DC2 and DC3 Joint Venture, in support of the Den Chai–Chiang Rai Double-Track Railway Construction Project. The wagons, which arrived in heavily weathered and worn condition, underwent thorough servicing covering mechanical system inspection and repair, hopper discharge gate mechanism overhaul, valve and control wheel servicing, undercarriage and bogie inspection, brake system checking, structural cleaning, and full surface preparation and repainting. Upon completion, all 12 units were lined up and confirmed ready for operational deployment, ensuring reliable ballast distribution performance throughout the construction corridor. This project demonstrates A.F.S. Enterprise's capability to efficiently service and restore large fleets of railway wagons to full operational standard within project timelines.

Related Content
Lifting & Re-railing of De-railed Locomotive — Red Line Project
A.F.S. Enterprise performed emergency lifting and re-railing of a de-railed locomotive for Pestech Technology on the Red Line Project, ensuring a safe and efficient recovery.
Testing of TMC 400 Equipment for V.Visarut Construction
A.F.S. Enterprise conducted comprehensive testing of TMC 400 equipment for V.Visarut Construction to verify its performance, safety, and operational reliability.
Re-gauge & Overhaul of F215 HP Locomotive from Japan
A.F.S. Enterprise completed comprehensive re-gauging and overhaul of an F215 HP locomotive from Japan for V.Visarut Construction, ensuring optimal operation in its new environment.
เว็บไซต์นี้มีการใช้งานคุกกี้ เพื่อเพิ่มประสิทธิภาพและประสบการณ์ที่ดีในการใช้งานเว็บไซต์ของท่าน ท่านสามารถอ่านรายละเอียดเพิ่มเติมได้ที่ Privacy Policy and Cookies Policy
Powered By MakeWebEasy Logo MakeWebEasy