Installation & Commissioning

A.F.S. Enterprise successfully converted road truck trailers into Standard Gauge (1435mm) flat wagons for Metroline Electrical Network Co., Ltd., ready for railway track deployment.

A.F.S. Enterprise completed the fabrication and installation of a safety work platform for a crawler crane, delivered to Metroline Electrical Network Co., Ltd. for use in electrical network construction operations.

A.F.S. Enterprise completed full service and commissioning of a standard-gauge motor car with crane for the MRT Orange Line Project.

A.F.S. Enterprise performed service and commissioning of 7 units of DMU in the Democratic Republic of Congo, Africa.

A.F.S. Enterprise successfully installed Automatic Train Protection (ATP) systems in Alsthom locomotive No. 4415 for Ground Transport (Thailand), enhancing operational safety.

A.F.S. Enterprise installed advanced laser alignment equipment to Tamping Machine 08-2X-32S for UNIQUE Engineering & Construction, improving track alignment accuracy and efficiency.

A.F.S. Enterprise completed custom modifications to match trucks for Machine Technology, improving functionality, compatibility, and operational efficiency.

A.F.S. Enterprise performed re-gauging services for UNIQUE Engineering & Construction, adapting railway equipment for different track gauges and ensuring operational flexibility.

A.F.S. Enterprise re-gauged Tamping Machine 08-2XS for Krungthon - Thai Products, ensuring performance and reliability.

A.F.S. Enterprise designed and installed new painting control board systems for the Red Line Project, enhancing operational efficiency and paint quality in railway maintenance facilities.

A.F.S. Enterprise re-gauged Tamping Machine 08-32 U for Tipakorn Company Limited, ensuring performance and compatibility with their railway infrastructure.

A.F.S. Enterprise performed comprehensive re-gauging of Tamping Machine 08-275 and its follow car for Unique Engineering & Construction, maintaining operational compatibility and performance standards.

A.F.S. Enterprise successfully re-gauged and sold a DS-6 800HP locomotive from Japan to Ch. Thawee Construction, meeting the client's operational requirements and quality standards.

A.F.S. Enterprise completed re-gauging and commissioning of a DD-51 locomotive from Japan for A.S. Associate Engineering (1964), ensuring seamless integration into the client's railway operations.

A.F.S. Enterprise successfully re-gauged a HOKI-800 ballast hopper wagon for Ch.Thawee Construction, ensuring precise modifications and efficient ballast handling operations.

Re-gauged aA.F.S. Enterprise re-gauged and commissioned a DD-51 locomotive from Japan for Laos Railway, ensuring reliable performance across the Laos railway network.nd commissioned DD-51 locomotive from Japan for Laos Railway.

A.F.S. Enterprise conducted comprehensive testing of TMC 400 equipment for V.Visarut Construction to verify its performance, safety, and operational reliability.